专长 / 近观
AI 智能体与自动化
按企业实际运转定范围的生产级 AI 与智能体 —— 每个关键环节都有人工参与。
机会
让下一步
成为更好的一步。
Teams lose hours moving information between tools, cleaning catalogues, assembling research and repeating checks. Most agent projects fail on scope, data and unclear approval — not on the model. We start from one real task, prototype on sample data and keep every consequential decision human.
We scope one task and its source of truth first, then define permissions, review points, evaluation checks and recovery states before any model is connected. Tool and API integrations (including MCP-style tool access) are layered in with least privilege, and output is tested against edge cases with guardrails and audit trails.
- 合作方式
- 指定交付负责人 + 团队
- 时间
- Discovery + prototype in 2–4 weeks; rollout scoped after
我们交付
聚焦正确的事。
- Task, input and approval mapping
- Tool + API integrations with scoped, least-privilege permissions
- Review-first agent interfaces and audit trails
- Agent evaluation, guardrails and recovery states
你的收获
可以真正运营的东西。
- Workflow map with scope, permissions and review points
- Working prototype on sample data
- Review, approval and audit interfaces
- Evaluation plan, integration, docs and support handover
探索交互
看工作流展开。
基于示例数据的可用界面演示。选一个任务,跟进进度,审核建议结果。
See the system
think in steps.
Choose a workflow, inspect the sample input and review the proposed output. You make the final call.
Find inconsistencies in a small sample product catalogue.
Product: Wireless headphones · Category: Audio · Compatibility: missing · Related products use the Headphones category.
- 01Inspect sample product fields
- 02Compare naming and categories
- 03Prepare suggested corrections
Your review workspace.
Run the example to reveal the proposed changes.
This browser simulation demonstrates the workflow and interface. Its sample responses are predefined; it does not call an AI model, access a store or publish changes.
开始之前
一点清晰
走得很远。
01开始需要我们提供什么?
问题的简短描述、现有网站或工具链接(如有)、以及有用结果的样子。不需要完整规格书。范围明确后约定访问、DPA/NDA 与内容需求。
02能在现有基础上做吗?
可以。从你的现状与约束出发。聚焦改进或集成可能胜过重建 —— 承诺前我们会给出带成本的选项与权衡。
03成本、时间与 SLA 如何约定?
调研后给出明确提案:交付物、里程碑、时间表、支持与 SLA 条款。签字开工;任何变更在额外工作前书面重新定范围。
相关专长