Ekspertiza / Izbliza
Cloud platforme — Azure i GCP
Landing zone, radna opterećenja i kontrola troškova na Azure i Google Cloud — cloud koji je projektovan, a ne samo uključen.
Prilika
Napravite sledeći korak
boljim.
Cloud accounts grow sideways: resources nobody owns, budgets that surprise at month end, and a production workload running on a VM someone set up in the console. Without a landing zone, identity boundaries and IaC, every new environment makes the drift worse — and migration projects stall on networking and permissions before a single workload moves.
We start with a landing zone: subscription structure, networking, identity boundaries and guardrails defined before the first workload lands. Infrastructure is Terraform from day one so environments are reproducible and reviewable, workloads are containerised where they benefit, and cost budgets with alerts ship alongside the deployment. Azure DevOps or GitHub Actions carries the pipeline — whichever your team already runs.
- Zajednički rad
- Imenovani vođa isporuke + tim
- Rokovi
- Landing zone in 2–4 weeks; migrations scoped per workload
Šta isporučujemo
Fokus na pravim stvarima.
- Azure and GCP landing zones: subscriptions, networking, guardrails
- Workload migration and modernisation (containers, App Service, Cloud Run)
- Terraform infrastructure as code across environments
- Cost governance: budgets, alerts and rightsizing reviews
Šta dobijate
Nešto što možete da vodite.
- Landing-zone design + deployed guardrails
- Workloads migrated with Terraform-managed infrastructure
- CI/CD on GitHub Actions or Azure DevOps
- Cost dashboards, budgets and a runbook handover
Pre nego što počnemo
Malo jasnoće
vodi daleko.
01Šta vam treba od nas da počnemo?
Kratak opis problema, link do trenutnog sajta ili alata ako postoji i kako bi koristan rezultat izgledao. Gotova specifikacija nije potrebna. Pristup, DPA/NDA i zahteve za sadržaj dogovaramo kada obim bude jasan.
02Možete li da radite sa onim što već imamo?
Da. Krećemo od vašeg trenutnog stanja i ograničenja. Fokusirano poboljšanje ili integracija često pobeđuje potpuni remont — objasnićemo opcije i kompromise sa procenom cene pre nego što se obavežete.
03Kako se dogovaraju trošak, rokovi i SLA?
Posle istraživanja izdajemo ponudu sa obimom: isporuke, miljokazi, rokovi, podrška i uslovi SLA. Rad počinje nakon potvrde; svaka promena se ponovo definiše u pisanoj formi pre nego što dodatni rad počne.
Povezana ekspertiza